The Posthole Company The Posthole Company
  • Home
  • Pricing
  • FAQ’s
  • Blog
  • Contact us
A white phone is on the black background

Phone Number

(905) 497-4653

The Posthole Company The Posthole Company
Menu

Tag Archives: How-To

manual digging near buried gas
21 Feb
General How-To's

Choosing A Post Hole Provider

  • April 8, 2026
  • By author-avatar admin

Not all post hole digging services are equal. Before hiring, learn the key questions to ask, what to look for in experienced Ontario crews, and why choosing a full-service provider can save you time, money, and costly mistakes on your next fence or deck project.

Continue reading

A man standing next to a red and black machine.
08 Aug
Deck Building, Footings

Footing Installation Guide

  • April 8, 2026
  • By author-avatar admin

Strong deck footings are the difference between a deck that lasts decades and one that sinks, shifts, or fails inspection. Learn how proper footing location, excavation depth, concrete pouring, and precise leveling come together to build a safe, code-compliant deck in Ontario.

Continue reading

17 Mar
Fence Post Holes, General How-To's

The Consequences of Installing Fence Posts Without Concrete

  • April 8, 2026
  • By author-avatar admin

Skipping concrete when setting fence posts might save time upfront, but it leads to leaning posts, wind damage, faster rot, and a fence that won’t last. Find out exactly what goes wrong without concrete — and why getting it right the first time is always the better investment.

Continue reading

How close to a house foundation can you dig post holes and footings?
10 Mar
Fence Post Holes, Footings, General How-To's

How close to a house foundation can you dig post holes and footings?

  • April 8, 2026
  • By author-avatar admin

How close to a house foundation can you safely dig post holes or footings? Learn the general 3-foot rule, why digging depth matters just as much as distance, and what to watch for regarding soil stability, drainage, and utility lines before breaking ground near your home.

Continue reading

Deck footing depth
03 Mar
Deck Building, Footings, General How-To's

Deck Footing Depths: A Complete Guide

  • April 8, 2026
  • By author-avatar admin

How deep do deck footings need to be in Ontario? The standard is 48 inches, but soil conditions, frost heave, deck size, and local building codes can all require going deeper. Learn when standard depth is enough and when your deck demands more to stay safe and stable long-term.

Continue reading

Deck Planning
25 Feb
Deck Building, General How-To's

The Ultimate Guide to Deck Planning Design and Construction

  • April 8, 2026
  • By author-avatar admin

A great deck starts long before the first board goes down. From assessing your space and defining your style to choosing the right materials, structural framing, and safety features — this complete planning guide covers everything Ontario homeowners need to build a deck they’ll love for years.

Continue reading

A logo for the post hole company.

Ontario post hole digging and fence building experts specializing in professional post hole services, deck footings, fence post installation, bollard setting, hoarding posts, and complete fence and deck construction. Trusted by homeowners and contractors across Ontario for reliable, fast, and affordable post hole solutions.

Quick Links

  • Home
  • Pricing
  • FAQ’s
  • Blog
  • Contact us

Connect With Us

A white phone is on the black background

(905) 497-4653

A black and white picture of an envelope.

info@thepostholecompany.com

Copyright © The Post Hole Company. All rights reserved.
  • Home
  • Pricing
  • FAQ’s
  • Blog
  • Contact us